Nissan 350Z Workshop Maunual 2005 (39) PDF | Page 26

SC-26
CHARGING SYSTEM
Revision: 2005 August 2005 350Z
PRELIMINARY INSPECTION
1. CHECK BATTERY TERMINALS CONNECTION
Check if battery terminals are clean and tight.
OK or NG
OK >> GO TO 2.
NG >> Repair battery terminals connection.
2. CHECK FUSE AND FUSIBLE LINK
Check for blown alternator and combination meter fuses.
OK or NG
OK >> GO TO 3.
NG >> If fuse is blown, be sure eliminate cause of malfunction before installing new fuse.
3. CHECK ?E? TERMINAL CONNECTION
Check if ?E? terminal is clean and tight.
OK or NG
OK >> GO TO 4.
NG >> Repair ?E? terminal connection.
4. CHECK ALTERNATOR DRIVE BELT TENSION
Check alternator drive belt tension. Refer to EM-14, "
Checking Drive Belts" .
OK or NG
OK >> INSPECTION END
NG >> Repair as needed.
DIAGNOSTIC PROCEDURE 1
Check ?L? Terminal Circuit (Open)
1. CHECK ?L? TERMINAL CONNECTION
1. Turn ignition switch OFF.
2. Check if ?L? terminal is clean and tight.
OK or NG
OK >> GO TO 2.
NG >> Repair ?L? terminal connection. Confirm repair by performing complete Battery/Starting/Charging
system test.
Unit Power source (Power supply terminals) Fuse No.
Alternator Battery (?S? terminal) 36
Combination meter Ignition switch ON (?L? terminal) 14