Subaru Forester Engine 1999 2000 (8) PDF

1. General Precautions
1) All parts should be thoroughly cleaned, paying
special attention to the engine oil passages, pis-
tons and bearings.
2) Rotating parts and sliding parts such as piston,
bearing and gear should be coated with oil prior to
assembly.
3) Be careful not to let oil, grease or coolant con-
tact the timing belt, clutch disc and flywheel.
4) All removed parts, if to be reused, should be
reinstalled in the original positions and directions.
5) Bolts, nuts and washers should be replaced
with new ones as required.
6) Even if necessary inspections have been made
in advance, proceed with assembly work while
making rechecks.
2. General Procedure
1) For the procedure of removing the engine from
the vehicle, refer to 2-11 ENGINE AND TRANS-
MISSION MOUNTING SYSTEM. <Ref. to 2-11
[W2A0].> However, before going into the
procedure, it is necessary to do the following.
Before disassembling engine, place it on ST3.
ST1 498457000 ENGINE STAND ADAPTER
RH
ST2 498457100 ENGINE STAND ADAPTER
LH
ST3 499817000 ENGINE STAND
S2M1859A
2) It is possible to conduct the following service
procedures with engine on the vehicle, however,
the procedures described in this section are based
on the condition that the engine is removed from
the vehicle.
Timing Belt
Valve Rocker Assembly
Camshaft
Cylinder Head
3) In this section the procedures described under
each index are all connected and stated in order.
It will be the complete procedure for over hauling
of the engine it-self when you go through all steps
in the process.
Therefore, in this section, to conduct the particular
procedure within the flow of a section, you need to
go back and conduct the procedure described pre-
viously in order to do that particular procedure.
13
[W200] 2-3SERVICE PROCEDURE
2. General Procedure

Subaru Forester Engine 1999 2000 (8) Summary of Content

1. General Precautions1) All parts should be thoroughly cleaned, payingspecial attention to the engine oil passages, pis-tons and bearings.2) Rotating parts and sliding parts such as piston,bearing and gear should be coated with oil prior toassembly.3) Be careful not to let oil, grease or coolant con-tact the timing belt, clutch disc and flywheel.4) All removed parts, if to be reused, should bereinstalled in the original positions and directions.5) Bolts, nuts and washers should be replacedwith new ones as required.6) Even if necessary inspections have been madein advance, proceed with assembly work whilemaking rechecks.2. General Procedure1) For the procedure of removing the engine fromthe vehicle, refer to 2-11 ENGINE AND TRANS-MISSION MOUNTING SYSTEM. Ref. to 2-11[W2A0]. However, before going into theprocedure, it is necessary to do the following. Before disassembling engine, place it on ST3.ST1 498457000 ENGINE STAND ADAPTERRHST2 498457100 ENGINE STAND ADAPTERLHST3 499817000 ENGINE STANDS2M1859A2) It is possible to conduct the following serviceprocedures with engine on the vehicle, however,the procedures described in this section are basedon the condition that the engine is removed fromthe vehicle. Timing Belt Valve Rocker Assembly Camshaft Cylinder Head3) In this section the procedures described undereach index are all connected and stated in order.It will be the complete procedure for over haulingof the engine it-self when you go through all stepsin the process.Therefore, in this section, to conduct the particularprocedure within the flow of a section, you need togo back and conduct the procedure described pre-viously in order to do that particular procedure.13[W200] 2-3SERVICE PROCEDURE2. General Procedure