2. Generator
A: REMOVAL AND INSTALLATION
1) Disconnect battery ground cable.
G6M0095
2) Disconnect connector and terminal from gen-
erator.
S2M0941
3) Remove V-belt cover.
S2M0896
4) Remove front side V-belt.
G2M0286
5) Remove bolts which install generator onto
bracket.
S2M0942
6) Install in the reverse order of removal.
CAUTION:
Check and adjust V-belt tension. <Ref. to 1-5
[G2A0].>
S2M0942
B: DISASSEMBLY
1) Remove the four through bolts. Then insert the
tip of a flat-head screwdriver into the gap between
the stator core and front bracket. Pry then apart to
disassemble.
S6M0404
12
6-1 [W2A0] SERVICE PROCEDURE
2. Generator